ASME Boiler Pressure Vessel Certification Project

Technology Exchange | 2017-11-16



The ASME Boiler and Pressure vessel (BPV) certification project shows that the design, manufacture, assembly and inspection of the boiler pressure vessel components comply with the requirements of the certification unit. Shortly after the first publication in 1916 of "specifications for the construction and permissible working pressure of stationary boilers" (now known as ASME BPVC), ASME began providing certification programs for enterprises in the pressurized equipment industry to demonstrate that their quality management system was in line with standards. At present, nearly 7,000 companies worldwide possess ASME certification.

The ASME BPV certification program is widely available, including but not limited to: power boilers, heating boilers, pressure vessels, fiber-reinforced plastic pressure vessels, transport tanks and valves.
 
ASME BPV Certificate
The products manufactured by ASME BPV are certified and stamped according to the applicable parts of the ASME Bpvc. At present, the ASME provides the following kinds of certificates.
 
Power Boiler
Volume 
S-Power Boiler
A-Power boiler installation
E-Electric Boiler
M-Small boilers
PP-Pressure Piping
V-Power Boiler safety valve
Prt-Parts Manufacturing

Heating Boilers
Volume IV
H-Heating boilers/heating (cast iron) boilers
Hlw-water heater with lining
Hv-Heating Boiler Safety VALVE
Prt-Parts Manufacturing
 
Pressure vessel
Volume VIII, Book 1th
U-pressure vessel (conventional design)
um-Small Pressure vessel
uv-Pressure Vessel safety valve
ud-Pressure Vessel Relief device
prt-Parts Manufacturing
 
Pressure vessel
Volume VIII, Book 2nd
u2-pressure vessel (pressure vessel another rule)
 
Pressure vessel
Volume VIII, book 3rd
u3-High Pressure vessel
uv3-High pressure vessel safety valve
ud3-high-pressure vessel pressure relief device
 
Fiber reinforced plastic Pressure vessel
Volume X
rp-fiber reinforced plastic pressure vessel
 
Transport Tank
Volume XII
T-Transport tank
tv-Transport Tank Safety valve
td-Transport tank Pressure relief device
prt-Parts Manufacturing
 
How to start an application
1th Step: Preparation and application
Login URL: GO.ASME.ORG/BPV to browse all application requirements, BPV lists, FAQs, and determine the scope of ASME-certified work.
• Additional content to be completed before submitting the application includes:
-Get the required criteria (for more details, please login to the website go.asme.org/requiredcodebooks).
-As stipulated in the standard, it is necessary to sign a contract with the Authorized Inspection Agency (AIA), Csei ASME Inspection Co., Ltd.---Special Inspection ASMI Technical Inspection (Beijing) Co., Ltd, is the ASME authorized nuclear power Inspection organization.
-Prepare and train personnel to implement the quality system in accordance with the BPVC standard.
 
• When you have completed the above steps, submit your application online.
 
2nd Step: Joint Inspection
The purpose of the Joint inspection is to evaluate the applicant's quality control manual and the ability to perform quality control manuals. The scope of the Joint inspection is based on the expected range of activities described by the applicant in the application.
 
ASME will review all activity points that the applicant mentions in the quality control manual that affect and control the quality, and ASME shall arrange the sites mentioned in the Review Group application form on a convenient date for the joint inspection.
 
The steps involved in on-site audits include:
 
  1, Manual Audit: The first day of the audit manual, generally not in the applicant's facilities. The time spent depends on the size and complexity of the manual, which typically takes 3-5 to four hours. The findings of the audit manual will be discussed at the first meeting of the general assessment team.
Pending the completion of the Joint inspection, the applicant will need to provide a revised quality manual to the JIU, which shall contain the corrective action proposed by the JIU and the surveyor/Director surveyor. (or a request for change made by JIU in the Joint Inspection Unit that does not require the authorization of the Inspection Agency).
 
  2. First meeting/Factory tour: Usually on the first day of the afternoon. The first meeting will give JIU and the applicant an opportunity to introduce each other: introduce the parties, review the application including the type of certificate and the scope of application, and introduce the joint audit schedule. The joint trial team leader will also introduce ASME's appeal policy and confidentiality policy.
 At the first meeting, the applicant can make an introduction to his company, product, personnel and so on. ASME encourages the company's senior management to attend the first meeting. The unit will make a brief factory visit at the end of the first meeting.
 
  3, the implementation phase: the applicant's Quality manual to reflect the appropriate examples, or demonstration products, or both. If any non conformance is found during the execution phase, these non conformance items will be discussed immediately with the applicant in order to have the opportunity to correct them before they reach a conclusion, and if the non conformance affects the construction of past or current examples, the JIU will need to prepare a written document determining the need for the applicant to take corrective action.
At the implementation stage, the applicant will have the opportunity to correct any uncovered discovery that was found by the unit. These uncovered findings either do not meet the requirements of the relevant standards, either do not meet the requirements of the applicant's quality manual, or both. Failure to clear the items in the joint trial will result in the joint trial team recommending another audit or a 30-day follow-up. Any such situation requires the applicant to rectify the discovery that was not closed.
 
  4. Internal meetings of the Review Group: During the implementation summary phase, the review team will convene an internal meeting to identify the results of the JIU recommendations to ASME.
 
  5. Last meeting: ASME encourages senior management to attend the last meeting. The JIU team leader will publish their findings in the joint trial, including any quality manuals observed by the Joint inspection team or in the implementation of inconsistent, inconsistent solutions, and JIU recommendations to ASME, which will ultimately determine whether to issue certificates. Applicants are encouraged to inquire about any issues related to the joint inspection, and to raise any issues or differences of concern to them during the period of the joint trial or any of the discrepancies referred to in the ASME report.
 
3rd Step: Publication of audit content/certificate
All non-closing items that are not closed at ASME will need to be corrected within 30 days or treated as recommended by the review team and ASME accepted. Correction and closure of the non conformance will need to be completed within the agreed time, otherwise ASME may detain the certificate.
 
4th Step: Certification and renewal
In addition to H card (cast iron/cast aluminum) and um (small pressure vessel) Valid for 1 years, other ASME BPV certificates are valid for three years. Each particular certificate is based on the requirements of the appropriate standards, and other additional considerations may be part of the certification process to verify that the applicant's quality control system is maintained and that the established elements of the previously identified quality control system are executed in accordance with specific requirements. In the final phase of the certificate cycle, the certificate holder obtains information about the process of updating the certificate.
 
Problems
• prepare for forensics phase
Q: Application form and Quality manual can be submitted in Chinese version?
A: No, you can't. All documents submitted to ASME must be submitted in English.
 
Q: Do I have to sign a contract with the Authorized Inspection Agency (AIA)?
A: This requirement is mandatory if you apply for a certification program that requires you to have an authorized inspection agency. You must sign a contract with a test-awarding agency.
 
Q: What are the authorized inspection agencies in the non-US and Canada regions?
A: Most of the authorized inspection agencies are international and can log on to their websites to find out how to contact their offices. To view the list of authorized inspection agencies, please login GO.ASME.ORG/BPV click on the "Authorized Inspection Agency list" located in the right-hand column.
 
Q: Can ASME provide advice to help applicants get their certificates?
A: ASME does not provide consulting services to help the quality control system meet BPVC standards. Such behavior can cause conflicts of interest.
 
• Financial Issues
Q: How much does it cost to apply for a certificate?
A: ASME does not charge an application fee alone. However, the submission of the application form requires the payment of a certificate fee and a deposit, which will include an audit fee. The cost and deposit of these items will be given in the go.asme.org/capricing.
 
Q: What kind of payment does ASME accept?
A: ASME can accept telegraphic transfer, cheque or credit card payment.
 
Q: How can I get proforma invoices?
A: Proforma invoices need to be submitted for application. Please send ca@asme.org an email requesting proforma invoice, which should provide your application number.
 
Q: What happens when you pay a fee?
A: If you have received a service contract with an authorized inspection agency (if necessary), your application status will be changed to "Wait for scheduling" and will enter the evaluation/audit/audit phase. You will be required to wait for the review/approval/audit date of ASME or Nbbi or your regulatory authority. It usually takes 3-4 months to determine the date.
 
• Certificate identification
Q: What is the size of the certification seal?
A: There are 1/2 inches and 3/4 inches of two. When you request a certificate identification, you need to indicate what size you want.
 
Q: Can we apply for more than one certificate for the certification of the logo seal?
A: Yes, an additional application for the certification logo seal needs to be purchased.
 
• time schedule
Q: When do we arrange for our review?
A: The ASME Review arrangement is usually 4 months after the full application form and the application fee are received. ASME will try to arrange the date of review as soon as possible.
 
Q: We have more than one site to apply for BPV certification. How can I arrange the date of the review?
A: In order to arrange the review dates for multiple sites, you need to submit the application form and the corresponding application fee in accordance with each site. Once submitted, please write to ca@asme.org requesting coordination of the review date. ASME arranges them at the same time as possible.
 
Q: How do we accept the proposed review date?
A: The date of the review must be accepted by the CA system in the 7 working orders that you receive a reminder. If we do not receive any reply, we will send a reminder again in 7 working orders. Please refer to the steps in your queued mail to accept the proposed date.
 
Q: When can I get specific review details?
A: Your company will be notified to log in to the CA system 4-6 weeks before the review schedule for specific review details.
 
Q: How many hotel rooms should we reserve for the ASME Review Group?
A: You only need to book a hotel room for the ASME Review Group identified in the CA system. Your authorized inspection agency will contact you directly if you need to book a hotel.
 
Q: If we have a meeting room in our factory, do we need to book a meeting room at the hotel?
Answer: Yes. In reviewing the Quality manual, ASME prefers not to address your site.
 
Q: What should we do when we need to reschedule, extend, or cancel the review date? What's going to happen?
A: Cancellation or extension requires deduction of a certain fee. If you need to reschedule the review date, write a message to ca@asme.org explaining the reason for the cancellation and the new review date that you want. For more information, see the relevant consequences of cancellation and the content of the fee deduction in the delivery notification.


COPYRIGHT 2005-2018 CSEI ASME Inspection Co.,Ltd. 京ICP备15054321号-1   |    About Us      |     Site Map     |      Links     |   Disclaimer     |    技术支持:北京网站建设 原创先锋

COPYRIGHT 2005-2018 CSEI ASME Inspection Co.,Ltd. 京ICP备15054321号-1

About Us Site Map 首页新闻中心Disclaimer

技术支持:北京网站建设 原创先锋